|
0949870 - Construction of the Sizewell B Nuclear Reactor. Suffolk, East Anglia, United Kingdom. Ariel view. The reactor costs £2.3 billion and will consist of 70,000 tons of steel, 341,000 cubic metres of concrete, and 1,800 miles of electric cables. It will need 3/4 million gallons of water a minute for cooling the turbines, which will then produce 1,200 mega watts, enough power for the whole of East Anglia. It will take 3,500 workers to build the Reactor. Date: 05.07.1990. Ref: UDW000911A30. COMPULSORY CREDIT: David Wimsett / UPPA / Photoshot
|
|